Wednesday, April 19, 2017

3/22-4/18

3/22-4/5 This was crunch time to get everything done for Paseo Prototyping challenge. With the help of the team, we assembled the track and I made last minute tweaks and welds to make sure components were going to hold together.

4/6-4/12 On the 8th, Saturday we presented at Paseo Prototyping challenge and everything worked and was presentable. I coordinated and organized everyone's volunteer times as well as set-up and break down.  On the 12th, we gave our presentation and discussed some minor improvements that should be made.

4/13-4/18 As much of the project is already completed, not much has been done since then. I have drawn up a couple sketches for Jez to 3D print. Most of the printing has been completed. At this time, I do not think we have started to print small ramps we would like to add the the U-brackets.